Fuzzy Evaluation and Risk Matrix Based on Overhead Lines Risk Assessment
摘 要
提出了一种结合模糊理论和风险矩阵法对输电线路安全风险进行评估的方法。首先,根据《电力安全事故应急处置和调查处理条例》等法律法规确定风险后果;其次,深入分析了影响输电线路运行状态的因素,建立了输电线路运行状态因素指标体系。以此为基础建立了输电线路模糊综合评价模型,用以评价风险发生概率;最后,用风险后果等级和风险发生概率构建了风险矩阵对风险进行分级,并制定相应的风险控制措施。以一个实际线路风险为例检验了该方法的可操作性,提出的风险评估方法可以为输电线路运维工作提供指导,从而降低电网运行风险。
Abstract
This paper studied the risk assessment method for transmission line security,combined of fuzzy theory and risk matrix.Firstly,the risk consequences were determined according to the relevant laws and regulations.Then,the transmission line status factor index system was established after indepth analysis. On this basis,the fuzzy comprehensive evaluation model was established,which was used to evaluate the probability of risks.Finally,the risks were graded by risk matrix,which was built with risk consequences and probability, and formulated the risk control measures.An example of an actual line risk test the operability of the method.Risk assessment methodology proposed in this paper could provide guidance for the operation and maintenance of transmission lines,thereby reducing the risk of power grid.
中图分类号 TM75
所属栏目 能源战略
基金项目
收稿日期 2014/9/12
修改稿日期
网络出版日期
作者单位点击查看
备注李冰然(1990),男,硕士研究生,研究方向为电力系统风险管控。
引用该论文: Li Bingran,Xia Linmin,Zhao Jingjing. Fuzzy Evaluation and Risk Matrix Based on Overhead Lines Risk Assessment[J]. Power & Energy, 2014, 35(6): 672~677
李冰然,夏临闽,赵晶晶. 基于模糊评价和风险矩阵的输电线路风险评估[J]. 电力与能源, 2014, 35(6): 672~677
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
参考文献
【1】张宁,韩富春,童国力,等.架空输电线路运行状态的可靠性评价[J].山西电力,2006(5):910.
【2】纪航,刘新平,杨庆华,等.基于模糊综合评价的超高压输电线路状态评估方法思考[J].华东电力,2009(7):11221126.
【3】王瑞祥,夏莹,熊小伏.计及气象因素的输电线路维修风险分析[J].电网技术,2010,34(1):219222.
【4】GB/T 27921—2011《风险管理风险评估技术》[S]。
【5】阮欣,尹志逸,陈艾荣.风险矩阵评估方法研究与工程应用综述[J].同济大学学报:自然科学版,2013(3):381385.
【6】张喜刚.公路桥梁和隧道工程设计安全风险评估[M].北京:人民交通出版社,2010.
【7】Degn Eskesen S, Tengborg P, Kampmann J, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No. 2[J]. Tunnelling and Underground Space Technology,2004,19(3):217237.
【8】周慧勤,马进,符金伟.基于AHP模糊综合评判法的风力发电机选型研究[J].华东电力,2012,40(9):14941498.
【9】廖瑞金,王谦,骆思佳,等.基于模糊综合评判的电力变压器运行状态评估模型[J].电力系统自动化,2008,32(3):7075.
【10】张晓明,吴焯军,甘艳,等.一种基于改进层次分析法的输电线路雷害风险评估模型[J].电力建设,2012,33(8):3539.
【11】Markowski A S, Mannan M S. Fuzzy risk matrix[J]. Journal of hazardous materials,2008,159(1):152157.
【2】纪航,刘新平,杨庆华,等.基于模糊综合评价的超高压输电线路状态评估方法思考[J].华东电力,2009(7):11221126.
【3】王瑞祥,夏莹,熊小伏.计及气象因素的输电线路维修风险分析[J].电网技术,2010,34(1):219222.
【4】GB/T 27921—2011《风险管理风险评估技术》[S]。
【5】阮欣,尹志逸,陈艾荣.风险矩阵评估方法研究与工程应用综述[J].同济大学学报:自然科学版,2013(3):381385.
【6】张喜刚.公路桥梁和隧道工程设计安全风险评估[M].北京:人民交通出版社,2010.
【7】Degn Eskesen S, Tengborg P, Kampmann J, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No. 2[J]. Tunnelling and Underground Space Technology,2004,19(3):217237.
【8】周慧勤,马进,符金伟.基于AHP模糊综合评判法的风力发电机选型研究[J].华东电力,2012,40(9):14941498.
【9】廖瑞金,王谦,骆思佳,等.基于模糊综合评判的电力变压器运行状态评估模型[J].电力系统自动化,2008,32(3):7075.
【10】张晓明,吴焯军,甘艳,等.一种基于改进层次分析法的输电线路雷害风险评估模型[J].电力建设,2012,33(8):3539.
【11】Markowski A S, Mannan M S. Fuzzy risk matrix[J]. Journal of hazardous materials,2008,159(1):152157.