Corrosion Problem and Management Recommendations in Project Stage of Nuclear Power Plant
摘 要
结合工程案例,研究了核电站工程阶段常见的腐蚀问题,并分析问题产生的原因。结果表明,在核电站工程阶段应对设备进行科学的防腐蚀分级,并在设计、制造、存储和安装进行防腐蚀管理。
Abstract
Combined with engineering cases, the reason of corrosion problem in nuclrear power station in project stage was investigated and analyzed. The results showed that the station should practise the system of management at different levels for all the equipment when they are designed, made, storaged and installed.
中图分类号 TG172.5
所属栏目 应用技术
基金项目
收稿日期 2013/7/25
修改稿日期
网络出版日期
作者单位点击查看
备注申罡(1985-),助理工程师,硕士,从事核电站腐蚀与防护管理工作,
引用该论文: SHEN Gang,WANG Zhu,XU Jin-sheng,HAN Hui-juan,YU Yuan-hong. Corrosion Problem and Management Recommendations in Project Stage of Nuclear Power Plant[J]. Corrosion & Protection, 2014, 35(5): 521