In-service Inspection of Pressurized Water Reactor Pressure Vessel Head
摘 要
介绍了压水堆核电站反应堆压力容器顶盖劣化和失效案例,以及核电机组的反应堆压力容器顶盖结构。结合案例分析了当前反应堆压力容器顶盖在役检查要求,阐述了满足在役检查要求的反应堆压力容器顶盖在役检查技术,分析了顶盖在役检查技术中表面检验和体积检验的技术难点以及解决措施。提出对我国压水堆反应堆压力容器顶盖实施定期在役检查的建议。
Abstract
This paper mainly introduces the cases of degradation and failure of reactor pressure vessel head (RPVH) in Pressurized Water Reactor (PWR) nuclear power plants, and the structure of RPVH of nuclear power units. It analyzed the current in-service inspection (ISI) requirements of RPVH, described RPVH ISI technology meeting the ISI requirements, and finally analyzed the technical difficult points of surface inspection and volume inspection and solutions. It proposed suggestions on periodical ISI for RPVH of domestic PWRs.
中图分类号 TG115.28
所属栏目 综述
基金项目
收稿日期 2013/5/3
修改稿日期
网络出版日期
作者单位点击查看
备注涂智雄(1986-),男,助理工程师,主要从事核电站在役检查工作。
引用该论文: TU Zhi-xiong,GUAN Yi-hao. In-service Inspection of Pressurized Water Reactor Pressure Vessel Head[J]. Nondestructive Testing, 2014, 36(2): 75~78
涂智雄,官益豪. 压水堆核电站反应堆压力容器顶盖在役检查[J]. 无损检测, 2014, 36(2): 75~78
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
相关信息