Supervision Control to Work Quality of Laboratory in Nuclear Power Construction Project
摘 要
列举了核电建设工程中各施工承包商理化实验室对于实验室规定检验项目中常出现的问题,分析了出现相关问题的原因,针对各种问题提出了解决方法,有助于加强实验室的管理,从而更有效地服务于工程建设。
Abstract
The problems happened frequently in the trade contract inspection items in the construction contractor laboratory in the nuclear power construction project were showed, the reasons to these problems were analyzed, and the solutions were suggested to strengthen the management of the laboratory, and it can provide good service to the construction project.
中图分类号 TU271.5 TU196
所属栏目 实验室管理
基金项目
收稿日期 2009/8/7
修改稿日期
网络出版日期
作者单位点击查看
备注马新朝(1974-),男,高级工程师,硕士。
引用该论文: MA Xin-chao. Supervision Control to Work Quality of Laboratory in Nuclear Power Construction Project[J]. Physical Testing and Chemical Analysis part A:Physical Testing, 2010, 46(7): 445~449
马新朝. 核电建设工程中对实验室工作质量的监理控制[J]. 理化检验-物理分册, 2010, 46(7): 445~449