Stress Calculation and Analysis of Cold Reheat Steam Pipe after Removing the Isolation Valves
摘 要
对某低温再热蒸汽管道去除堵阀后支吊架的工作载荷、管道受到的应力及管道对低温再热器入口联箱的推力进行了计算分析。结果表明:去除堵阀后管道的一次推力及力矩极大地升高了,更换部分恒力支吊架、调小部分恒力支吊架载荷后,可以保证低温再热蒸汽管道的正常运行。
Abstract
The working load of the suspensions and supports after removing the isolation valves of cold reheat steam pipe, the stress of the pipe and the thrust force of the pipe to the inlet box of the cold reheater were calculated and analyzed. The results show that the thrust force and the moment of the pipe increased greatly after removing the isolation valves. After replacing some constant suspensions and supports and lowering the load of some constant suspensions and supports, it was possible to ensured the normal operation of the cold reheat steam pipe.
中图分类号 TB12 DOI 10.11973/lhjy-wl201901009
所属栏目 实践经验
基金项目
收稿日期 2017/12/28
修改稿日期
网络出版日期
作者单位点击查看
备注巨欢乐(1984-),女,助教,主要从事教学管理研究,289513445@qq.com
引用该论文: JU Huanle,LIU Bin. Stress Calculation and Analysis of Cold Reheat Steam Pipe after Removing the Isolation Valves[J]. Physical Testing and Chemical Analysis part A:Physical Testing, 2019, 55(1): 35~38
巨欢乐,刘宾. 去除堵阀后低温再热蒸汽管道应力计算及分析[J]. 理化检验-物理分册, 2019, 55(1): 35~38
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
参考文献
【1】郭延军,邵尉涛. 在役管道支吊架状态异常对电厂安全运行的影响[J]. 制冷空调与电力机械,2005,26(5):78-80.
【2】刘纯,谢国胜,陈红冬. 主蒸汽管道应力分析与校核[J]. 湖南电力,2002,22(2):13-14.
【3】潘军光,刘宾,马志强,等. 330 MW机组主蒸汽管道振动分析与治理[J]. 理化检验(物理分册),2011,47(4):232-235.
【2】刘纯,谢国胜,陈红冬. 主蒸汽管道应力分析与校核[J]. 湖南电力,2002,22(2):13-14.