Application of Finite Element Method in Cathodic Protection Design for Immersed Tunnel Steel Structure
摘 要
为解决沉管隧道钢结构表面阴极保护电位难以计算和测试的问题,采用数值模拟技术,对某项目阴极保护设计方案进行了优化,并使用缩比模型间接验证了模拟结果的准确性。结果表明:对于沉管隧道来说,由于无法在沉管钢壳底部布置牺牲阳极,欠保护区域通常出现在沉管底部;若将阳极均匀布置在除钢壳底面外的其他表面,沉管钢壳的顶面或侧面与底面之间的电位差为70~100 mV,钢壳底面处于欠保护状态;在沉管钢壳的侧面增加牺牲阳极的数量,沉管底面电位的负移量较大,牺牲阳极的保护效果较好。
Abstract
In order to solve the problem that the cathodic protection potential on the surface of immersed tunnel steel structure was difficult to calculate and test, the cathodic protection design of a project was optimized by numerical simulation technology. The accuracy of the simulation results was indirectly verified by the scale model. The results showed that for the immersed tunnel, the under-protected area usually appears at the bottom of the immersed tube because the sacrificial anode cannot be arranged at the bottom of the immersed tube steel shell. If the anode was evenly arranged on other surfaces except the bottom surface of the steel shell, the potential difference between the top or side of immersed tube steel shell and the bottom surface was 70-100 mV, and the bottom surface of steel shell was in an under-protected state. By increasing the number of sacrificial anodes on the side of immersed tube steel shell, the negative shift of the potential at the bottom of immersed tube was larger, and the protection effect of sacrificial anode was better.
中图分类号 TG174.42 DOI 10.11973/fsyfh-202306014
所属栏目 应用技术
基金项目 广东省重点领域研发计划专项(2019B111105002)
收稿日期 2022/10/14
修改稿日期
网络出版日期
作者单位点击查看
联系人作者许实(xushi@sunrui.net)
引用该论文: XU Shi,DONG Ruyi,WANG Hui,WANG Haitao,LUO Weihua,WANG Tingyong. Application of Finite Element Method in Cathodic Protection Design for Immersed Tunnel Steel Structure[J]. Corrosion & Protection, 2023, 44(6): 90
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
参考文献
【1】宋神友,聂建国,徐国平,等.双钢板-混凝土组合结构在沉管隧道中的发展与应用[J].土木工程学报,2019,52(4):109-120.
【2】王艳宁,熊刚.沉管隧道技术的应用与现状分析[J].现代隧道技术,2007,44(4):1-4.
【3】WU X D,XI J J,LIU H,et al.Intelligent casting technology of self-compacting concrete for steel-shells of Shenzhen-Zhongshan link immersed tunnel tubes[J].Tunnel Construction,2022,42(2):328-335.
【4】傅琼阁.沉管隧道的发展与展望[J].中国港湾建设,2004,24(5):53-58.
【5】姜伟,袁勇.沉管结构预制阶段裂缝控制参数影响分析[J].中国公路学报,2020,33(2):114-124.
【6】赵永韬,宋神友,孙仁兴,等.抛石环境中铝合金阳极性能评价及其对海底隧道钢壳保护效果评估[J].装备环境工程,2021,18(9):78-85.
【7】庄大伟,杜艳霞,陈涛涛,等.区域阴极保护数值模拟边界条件反演计算方法研究及应用[J].中国腐蚀与防护学报,2021,41(3):346-352.
【8】李民强,郑震生,董亮,等.海洋平台导管架外加电流阴极保护设计数值模拟[J].表面技术,2016,45(7):109-114.
【9】赵会军,杜鹏宇,董亮,等.阴极保护检查片接地电阻数值模拟与实验研究[J].表面技术,2020,49(1):262-268.
【10】查鑫堂,张建文,陈胜利,等.杂散电流干扰和阴极保护作用下碳钢腐蚀规律研究[J].表面技术,2015,44(12):12-18,26,8.
【11】赵林,王骑,宋神友,等.深中通道伶仃洋大桥(主跨1666 m)抗风性能研究[J].中国公路学报,2019,32(10):57-66.
【12】LIU J,DENG B,HUANG Q F.Design and manufacturing techniques for steel-shell structure of Shenzhen-Zhongshan link's immersed tunnel[J].Tunnel Construction,2021,41(8):1367-1374.
【13】金文良,宋神友,陈伟乐,等.深中通道钢壳混凝土沉管隧道总体设计综述[J].中国港湾建设,2021,41(3):35-40.
【14】KASPER R G,APRIL M G.Electrogalvanic finite element analysis of partially protected marine structures[J].Corrosion,1983,39(5):181-188.
【15】FU J W,CHAN S K.A finite element method for modeling localized corrosion cells[J].Corrosion,1984,40(10):540-544.
【2】王艳宁,熊刚.沉管隧道技术的应用与现状分析[J].现代隧道技术,2007,44(4):1-4.
【3】WU X D,XI J J,LIU H,et al.Intelligent casting technology of self-compacting concrete for steel-shells of Shenzhen-Zhongshan link immersed tunnel tubes[J].Tunnel Construction,2022,42(2):328-335.
【4】傅琼阁.沉管隧道的发展与展望[J].中国港湾建设,2004,24(5):53-58.
【5】姜伟,袁勇.沉管结构预制阶段裂缝控制参数影响分析[J].中国公路学报,2020,33(2):114-124.
【6】赵永韬,宋神友,孙仁兴,等.抛石环境中铝合金阳极性能评价及其对海底隧道钢壳保护效果评估[J].装备环境工程,2021,18(9):78-85.
【7】庄大伟,杜艳霞,陈涛涛,等.区域阴极保护数值模拟边界条件反演计算方法研究及应用[J].中国腐蚀与防护学报,2021,41(3):346-352.
【8】李民强,郑震生,董亮,等.海洋平台导管架外加电流阴极保护设计数值模拟[J].表面技术,2016,45(7):109-114.
【9】赵会军,杜鹏宇,董亮,等.阴极保护检查片接地电阻数值模拟与实验研究[J].表面技术,2020,49(1):262-268.
【10】查鑫堂,张建文,陈胜利,等.杂散电流干扰和阴极保护作用下碳钢腐蚀规律研究[J].表面技术,2015,44(12):12-18,26,8.
【11】赵林,王骑,宋神友,等.深中通道伶仃洋大桥(主跨1666 m)抗风性能研究[J].中国公路学报,2019,32(10):57-66.
【12】LIU J,DENG B,HUANG Q F.Design and manufacturing techniques for steel-shell structure of Shenzhen-Zhongshan link's immersed tunnel[J].Tunnel Construction,2021,41(8):1367-1374.
【13】金文良,宋神友,陈伟乐,等.深中通道钢壳混凝土沉管隧道总体设计综述[J].中国港湾建设,2021,41(3):35-40.
【14】KASPER R G,APRIL M G.Electrogalvanic finite element analysis of partially protected marine structures[J].Corrosion,1983,39(5):181-188.
【15】FU J W,CHAN S K.A finite element method for modeling localized corrosion cells[J].Corrosion,1984,40(10):540-544.
相关信息