Slag Removal Water Disposal System Optimization of 300MW Coal-fired Machine Set
摘 要
上海吴泾热电厂8、9号机组除渣系统为闭式循环, 采用水力除渣方式。运行过程中发现由于进出水量不均衡, 造成渣水处理系统会产生大量高pH值废水进入雨水系统, 给废水处理工作和环保工作造成较大压力。经过对渣水处理系统设备和管路的改造, 解决了系统水量不均衡和废水排放等问题。改造后, 系统运行产生的能耗和污染都得到了明显改善, 达到了节能减排的效果。
Abstract
Wujing thermoelectric plant slag removal system of 8 and 9 machine set adopts a hydraulic slag removal method, which is a closed cycle. If it is found imbalance between inflow and outflow in the progress, it makes the slag removal water disposal system generate large amounts of wastewater with high pH to enter a rainwater system, which results in greater pressure for wastewater disposal work and environmental protection work. The problems, such as waster amount imbalance in systems, wastewater discharge, are solved by transforming water disposal system equipment and pipeline for slag removal. After transformation, energy consumption and pollution generated by system operation gains obvious improvement, and it achieves energy saving and emission reduction effect.
中图分类号 TK227.3
所属栏目 成果与经验
基金项目
收稿日期 2012/7/25
修改稿日期
网络出版日期
作者单位点击查看
备注陈刚(1977-),男, 工程师, 本科, 从事火电厂脱硫、除灰和除渣系统的检修与管理工作。
引用该论文: Chen Gang. Slag Removal Water Disposal System Optimization of 300MW Coal-fired Machine Set[J]. Power & Energy, 2012, 33(6): 613~616
陈刚. 300 MW燃煤机组渣水处理系统优化[J]. 电力与能源, 2012, 33(6): 613~616
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
参考文献
【1】韩建新.锅炉除渣水系统的治理[J].中国新技术新产品, 2010(6): 145.
【2】沈保中.600MW超临界机组锅炉冲渣水回用的深度处理[J].中国电力, 2006, 39(7): 31-34.
【3】杨佳珊, 黄涛.火电厂废水处理后回用于烟气脱硫系统的可行性[J].东北电力技术, 2007, 28(11): 35-37.
【4】朱瑞佳, 张志刚, 张大全.渣水储水池出水作为脱硫吸收塔补水的可行性研究[J].上海电力学院学报, 2010, 26(3): 254-256.
【2】沈保中.600MW超临界机组锅炉冲渣水回用的深度处理[J].中国电力, 2006, 39(7): 31-34.
【3】杨佳珊, 黄涛.火电厂废水处理后回用于烟气脱硫系统的可行性[J].东北电力技术, 2007, 28(11): 35-37.
【4】朱瑞佳, 张志刚, 张大全.渣水储水池出水作为脱硫吸收塔补水的可行性研究[J].上海电力学院学报, 2010, 26(3): 254-256.
相关信息