The Function Orientation and Technical Requirement of Power Plant AVC in Power Grid
摘 要
介绍了当前自动电压控制(AVC)的总体发展形势及发电厂AVC的发展状态, 论述了发电厂AVC系统的定义、作用、定位、技术要求和管理方法, 提出了要认真贯彻发电厂AVC安全策略总原则, 加强AVC在无功管理方面的运算能力和策略适应性, 关注每个控制细节,以期从本源出发, 理解和管理好发电厂AVC, 充分发挥AVC这一先进控制手段, 给电网运行带来更多的社会和经济效益。
Abstract
This paper introduces the overall development situation of automatic voltage control (AVC) technology and power plant AVC, discusses the definition, function, orientation, technical requirement and management of power plant AVC. Seriously carry out the power plant AVC security policy principles, strengthen the AVC in reactive power management operation capability and strategic adaptation, paying close attention to each details of control, understanding and management of power plant AVC from the Original intention of AVC, give full play to the AVC control methods, all those can bring to the power grid good social and economic benefits.
中图分类号 TM714.2
所属栏目 电力技术
基金项目
收稿日期 2012/4/18
修改稿日期
网络出版日期
作者单位点击查看
备注张健(1981-), 男, 工程师, 硕士研究生, 从事励磁控制和电力系统自动化工作。
引用该论文: Zhang Jian. The Function Orientation and Technical Requirement of Power Plant AVC in Power Grid[J]. Power & Energy, 2012, 33(4): 320~322
张健. 发电厂自动电压控制在电网中的功能定位和技术要求[J]. 电力与能源, 2012, 33(4): 320~322
共有人对该论文发表了看法,其中:
人认为该论文很差
人认为该论文较差
人认为该论文一般
人认为该论文较好
人认为该论文很好
参考文献
【1】伍期刚, 翟海保. 大运行模式下无功电压自动控制(AVC)系统的探讨[J].华东电力,2011,39(1): 112-114.
相关信息