Analysis of Wind Farm’s Connection modes, Grid Connection and Operation Modes
摘 要
“十一五”期间, 上海南汇地区先后建造了35 kV南汇风电场、110 kV东海大桥风电场和35 kV临港新城风电场。通过对南汇地区3个风电场的建设回顾, 比较了风电场的主接线形式和运行方式, 分析了风电场的并网操作和低电压穿越等问题, 并提出了有待改进的技术措施和相关建议。
Abstract
Three different wind farms have been built in the “Eleven-five year” period at Nanhui Distract in Shanghai. They are 35 kV Nanhui wind farm, 110 kV Donghai Bridge wind farm and 35 kV Lingang New City wind farm. Firstly, comparison the connection and operation modes of three wind farms has been made. Then the paper analyzes the operation of grid connection and LVRT. Finally, suggestion to optimize the technical measures of wind farm is proposed.
中图分类号 TM614
所属栏目 新能源技术
基金项目
收稿日期 2011/10/8
修改稿日期
网络出版日期
作者单位点击查看
备注袁静蔚(1981-), 女, 工程师, 本科, 从事电网调度工作。
引用该论文: Yuan Jingwei. Analysis of Wind Farm’s Connection modes, Grid Connection and Operation Modes[J]. Power & Energy, 2012, 33(1): 65~68
袁静蔚. 风电场的主接线、并网和运行方式分析[J]. 电力与能源, 2012, 33(1): 65~68