The Supervision and Inspection of the Quality of X-ray Testing During Boiler Installation
摘 要
对锅炉安装射线检测质量的监检过程中发现的人员管理、检测设备和环境管理、检测工艺方法、底片质量和评定准确性等方面存在的问题进行了综述,并提出了有针对性的建议,即安装单位与监检单位必须互相配合,及时宣贯新检测标准。
Abstract
Some key factors during the supervision and inspection of radiographic testing for boiler installation were surveyed, such as the management of personnel, equipment and environment, the testing process, film quality and evaluation accuracy. The suggestion was given in order to meet the new testing standard that the boiler installation company should have good cooperation with supervision and inspection company.
中图分类号 TG115.28
所属栏目 质量控制与管理
基金项目
收稿日期 2006/9/11
修改稿日期
网络出版日期
作者单位点击查看
备注倪进飞(1971-),男,无损检测高级工程师。
引用该论文: NI Jin-fei. The Supervision and Inspection of the Quality of X-ray Testing During Boiler Installation[J]. Nondestructive Testing, 2007, 29(10): 609~610
倪进飞. 锅炉安装中射线检测质量的监督检验[J]. 无损检测, 2007, 29(10): 609~610