Implement Method of Process Validation in NB/T 47013-2015 Nondestructive Testing of Pressure Equipments
摘 要
NB/T 47013-2015《承压设备无损检测》对首次使用的检测操作指导书提出了工艺验证要求,以证实其适用性和有效性。由于部分检测人员对工艺验证的理解和标准的执行存在偏差,因此通过示例列举和说明了工艺验证的具体实施方法,以便在实际工作中正确应用标准中工艺验证的实施方法,发挥检测操作指导书在检测工作中的应有作用。
Abstract
The standard of NB/T 47013-2015 Nondestructive Testing of Pressure Equipments requests the process validation be performed to validate its applicability and effectiveness while the test operation instruction manual is being initially used. At present, some detection persons cannot understand it thoroughly so that they execute standard not well enough. The method of specific implementations are expounded through examples so process certification could be applied correctly in actual work, and made the instruction manual of test operation play a due role in detection work.
中图分类号 TG115.28 DOI 10.11973/wsjc201903018
所属栏目 标准化
基金项目
收稿日期 2018/7/27
修改稿日期
网络出版日期
作者单位点击查看
备注张志勇(1971-),男,工程师,主要从事石化建设工程无损检测工作
引用该论文: ZHANG Zhiyong. Implement Method of Process Validation in NB/T 47013-2015 Nondestructive Testing of Pressure Equipments[J]. Nondestructive Testing, 2019, 41(3): 72~75
张志勇. NB/T47013-2015《承压设备无损检测》中工艺验证的实施方法[J]. 无损检测, 2019, 41(3): 72~75