    Development Status of In-Service Inspection Robot Technology for Steam Generator Primary Side

    More Information
    • Received Date: May 29, 2011
    • In-service inspection(ISI) of nuclear power plant is an important link for keeping safety operation. The levels of ISI technology mostly depend on the complete key equipment. The development status of special robot for steam generator primary side was reviewed, and then their key technology and trend were analyzed. Some suggestions for Chinese independent development of ISI complete key equipment technology were given.
    • [1]
      Obrutsky L, Renaud J, Lakhan R. Steam Generator Inspections: Faster, Cheaper And Better, Are We There Yet[C]. IV Conferencia Panamericana de END, Buenos Aires, Canada,2007:1-17.
      [2]
      Hedtke James C. At the service of steam generator maintenance[J]. Nuclear Engineering International,2000,45(551):37.
      [3]
      http: //www.westinghousenuclear.com/C2a25.as.
      [4]
      Petrosky L J. Innovative robot for inspection of nuclear steam generators[C]. 1st Joint Emergency Preparedness and Response/Robotic and Remote Systems Topical Meeting, Salt Lake City, UT, USA,2006: 462-465.
      [5]
      http: //www.zetec.com
      [6]
      http: //www.zetec.com/industries/energy/steamgenerators.as.
      [7]
      Philippe D, Piolain Gérard. An Overview of the Remote Handling Technologies Developed for Nuclear Hazardous Environments in France[C]. 1st Joint Emergency Preparedness and Response/Robotic and Remote Systems Topical Meeting, Salt Lake City, UT, USA. 2006: 381-388.
      [8]
      http: //www.framatome-anp.com
      [9]
      Jinichi Miyaguchi, Kozo Tabuchi, Tetsuya Yamamoto. Towards maintenance service supporting secure nuclear energy[J]. Mitsubishi Heavy Industries, Ltd. Technical Review,2003,40(2):1-7.
      [10]
      Bains N, Majarais B, Scott D A. Cleaning of steam generator tubes at the primary side using a general purpose manipulator[C]. Proceedings of the 1995 43rd Conference on Robotics and Remote Systems, San Francisco, CA, USA,1995:94-101.
      [11]
      Jeong K, Choi Y, Lee S. Tele-operated robotic systems for nuclear power plants in South Korea and lessons learned[C]. 1st Joint Emergency Preparedness and Response/Robotic and Remote Systems Topical Meeting, La Grange Park, IL, USA,2006:497-502.
      [12]
      Rastogi A K, Gaur D N, Godbole U. Indigenous Development of an Integrated System for Steam Generator Eddy Current In-service Inspection[J]. Nu-Power,2000,14(4):35-37.