Citation: | WANG Xu-dong, XU Jie, SUN Dong-bai, MENG Hui-min, YU Hong-ying, FAN Zi-shuan. Appraisal of Oversea Oil Gas Pipeline Defect Assessment Methods[J]. Materials and Mechanical Engineering, 2009, 33(4): 6-9. |
[1] |
NN/HW. Appraisal and development of pipeline defect assessment methodologies[R].Berkshire: MSL Engineering,2000:6-8.
|
[2] |
API 1104-1994Welding of Pipelines and Related Facilities[S].
|
[3] |
隋永莉,薛振奎,赵海鸿.石油天然气金属管道焊接工艺评定标准对比分析[J].压力容器,2006,23(6):1-5.
|
[4] |
郜鹏华.美国API 1104与我国JB 4730标准在管口焊缝质量评定上的差异[J].无损检测,2000,22(6):265-268.
|
[5] |
BS 7910-1999Guide on Methods for Assessing the Acceptability of Flaws in Metallic Structures[S].
|
[6] |
邓彩艳,张玉凤,霍立兴,等.基于BS 7910海底外输管线ECA评估[J].焊接学报,2006,27(1):17-20.
|
[7] |
陈国明,方华灿.近海在役管道安全可靠性评估技术研究[J].石油工业技术监督,2004(10):5-9.
|
[8] |
HARRISON R P,LOOSEMORE K,MILNE I. Assessment of the integrity of structures containing defects[R].London: British Enorgy Generation UK Ltd,1976.
|
[9] |
MILNE I,AINSWORTH R A,DOWLING A R,et al. Background to and validation of CEGB report R/H/R6-Revsion 3[J].Int J Pres Ves and Piping,1988,32(1/4):105-196.
|
[10] |
DOWLING A R,TOWNLEY C H. The effects of defects on structural failure: a two-criteria approach[J].Int J Pres Vel and Piping,1975,3(2):77-107.
|
[11] |
HEALD P T,SPINK G M,WORTHINGTON P J. Post-yield fracture mechanics[J].Mater Sci Engineering,1972,10:129-138.
|
[12] |
武淮生.结构完整性概率R6评定方法的研究[D].北京:北京航空航天大学,1996:20-25.
|
[13] |
ASME B31G-1991Manual for determining the remaining strength of corroded pipelines[S].
|
[14] |
王正淘,李著信,褚家荣.含缺陷管道评价标准及方法研究[J].后勤工程学院学报,2004(4):76-79.
|
[15] |
帅健.腐蚀管线的剩余寿命预测[J].石油大学学报:自然科学版,2003,27(4):91-93.
|
[16] |
宋旭,张振文,闫琳,等.基于管道爆破试验对ASME B31G标准中相关参数的修正[J].焊管,2008,31(1):84-87.
|
[17] |
DNV RP-F101-1999Recommended practice for corroded pipelines[S].
|
[18] |
帅健,张春娥,陈福来.腐蚀管道剩余强度评价方法的对比研究[J].天然气工业,2006,26(11):122-125.
|
[19] |
董绍华,杨祖佩.全球油气管道完整性技术与管理的最新进展——中国管道完整性管理的发展对策[J].油气储运,2007,26(2):1-17.
|
[20] |
COSHAM A,HOPKINS P,MACDONALD K A. Best practice for the assessment of defects in pipelines-corrosion[J].Engineering Failure Analysis,2007,14(7):1245-1265.
|