                 能源技术


                               基于电碳耦合的配电网电源规划



                       施 勇 , 顾唯华 , 刘 睿 , 徐 韬 , 陈 聪 , 沈海丹 , 贺 康                                  2
                               1
                                                                           1
                                                                                     1
                                                                1
                                          1
                                                     1
                            ( 1. 国网上海市电力公司崇明供电公司, 上海 202150 ; 2. 上海电力大学, 上海 200090 )
                   摘   要: 在“ 双碳” 目标的大背景下, 高比例的可再生能源接入电网代替传统高碳机组已成为大趋势。以高比
                   例可再生能源电力系统为研究对象, 考虑投资和运行维护两个维度对电力系统源 - 网 - 荷 - 储各侧电源装机容
                   量进行中长期规划, 建立了电力系统源 - 网 - 荷 - 储协同优化配置模型。以崇明生态岛电力系统为基本算例, 考
                   虑峰荷和全社会用电量的增长的不同情况设置了场景进行分析, 针对不同场景给出了相应的电源规划情况。
                   对两种低碳约束条件进行分析, 研究了两种低碳约束条件在生态岛算例中的重要作用。
                   关键词: 灵活性资源; 高比例可再生资源; 低碳; 电源规划
                   基金项目: 国网上海电力公司科学技术项目( GSHCM00HWJS2101137 )
                   作者简介: 施   勇( 1976 —), 男, 工程师, 研究方向为电力信息系统及新能源。
                   中图分类号: TM73   文献标志码: A   文章编号: 2095-1256 ( 2022 ) 03-0249-07
                      PowerPlannin g ofDistributionNetworkBasedonElectricCarbonCou p lin g

                           1             1         1         1             1 ,             1          2
                  SHIYon g  , GU Weihua , LIU Rui , XU Tao , CHENCon g SHEN Haidan , HEKan g
                           ( 1.StateGridChon g min gPowerSu pp l yCom p an y , SMEPC , Shan g hai202150 , China ;
                                   2.Shan g haiElectricPowerUniversit y , Shan g hai200090 , China )

                  Abstract : Undertheback g roundof"CarbonPeakin gandCarbon Neutralit y "g oal , ithasbecomeag eneral
                  trendthatahi g hp ro p ortionofrenewableener gy isconnectedtothe p ower g ridtore p lacethetraditionalhi g h-
                  carbonunits.Takin gthehi g h- p ro p ortionrenewableener gyp owers y stemastheresearchob j ect , considerin g
                  thetwodimensionsofinvestmentando p erationandmaintenance , themediumandlon g -termp lannin gofthe
                  installedca p acit yof p owersu pp l yonthesideof"source , g rid , load , stora g e"of p owers y stemiscarriedout ,
                  andthecollaborativeo p timalallocationmodelofp owers y stemisestablished.Takin gChon g min gEcolo g ical
                  Islandp owers y stemasabasicexam p le , considerin g thedifferentsituationsof p eakloadandsocial p owercon-
                  sum p tiong rowth , thescenariosaresetforanal y sis , andthecorres p ondin gp ower p lannin g is g ivenfordiffer-
                  entscenarios.Twolow-carbonconstraintsareanal y zed , andtheim p ortantroleoftwolow-carbonconstraints
                  inthecalculationofecolo g icalislandisstudied.
                  Ke ywords : flexibleresources , hi g hp ro p ortionofrenewableresources , lowcarbon , p ower p lannin g

                 “ 节能”“ 减排”“ 可持续发展” 已然成为当着世                    之也带来了电源规划方面的转变。
              界能源产业发展的重要趋势, 电力行业也提出了
                                                              1  传统电力系统的电源规划
              低碳环保的新要求。
                   在电 力 系 统 中 实 现 “ 低 碳 ” 主 要 有 两 种 方              以常规电源为主的传统电力系统电源规划,
              法  [ 1 ] : 一种是吸收和固定二氧化碳, 在电力系统中                  首先是进行负荷预测, 然后根据峰荷确定电源容
              主要体现在电厂碳捕集能力的提升; 另一种是提                           量, 并留有一定量的备用, 这样就能够保障电量、
              高清洁能源的比例, 减少对化石能源的过度依赖,                          电力供需之间的平衡。
              在电力系统中主要体现在风、 光等可再生能源装                               传统电源( 火电、 水电) 既能保证稳定性又能
              机容量的增加       [ 2-4 ] 。由于碳捕集存在诸多限制, 因             提供灵活性, 满足负荷侧灵活性需求。文献[ 5 ] 建
              此高比例可再生能源接入电网就成为大趋势, 随                           立了以规划期内费用最小为主要目标的传统电力