                  输变电工程造价管控全过程风险识别与策略研究



                                    张惠玲 ,崔          翔 ,刘       芳 ,徐其丹 ,申亚波              2
                                            1
                                                                             2
                                                       2
                                                                  2
                                    (1. 国网新疆电力有限公司,新疆维吾尔自治区 乌鲁木齐 830011;
                               2. 国网新疆电力有限公司经济技术研究院,新疆维吾尔自治区  乌鲁木齐 830000)
                    摘   要:面对新时代发展战略,电网企业需要大力推动改革创新、激发内生动力,实施“双轮驱动”行动。如何
                    贯彻这一要求、不断加强过程管控、降低经营成本与管控风险,是摆在电网企业面前的的问题。结合当前输变
                    电工程的实际特点,开展造价风险识别与策略研究,有助于深入挖掘出输变电工程造价管控过程中存在的风
                    险,同时对科学地提高工程造价风险管理水平,保障电网企业对输变电工程造价风险进行精准的、合理的预
                    判、预防和控制,提高工程建设的效率和效益,以及达到提质增效的要求等,都具有重要的作用。
                    关键词:输变电工程;造价全过程;风险识别;应对策略
                    作者简介:张惠玲(1974—),女,高级经济师,从事电网建设项目管理,工程造价管理工作。
                    中图分类号:TM72    文献标志码:A    文章编号:2095-1256(2023)06-0670-04
                  The Whole Process Risk Identification and Strategy Research for the Cost Control of

                                     Power Transmission and Transformation Project


                                                          2
                                                                    2
                                                                               2
                                              1

                               ZHANG Huiling ,CUI Xiang ,LIU Fang ,XU Qidan ,SHEN Yabo      2



                    (1.State Grid Xinjiang Electric Power Co.,Ltd.,Urumqi 830011,Xinjiang Uygur Autonomous Region,China;




                2.Economic and Technological Research Institute,State Grid Xinjiang Electric Power Co.,Ltd.,Urumqi 830000,Xinjiang




                                                 Uygur Autonomous Region,China)


                    Abstract:In  the  face  of  the  development  strategy  of  the  new  era,  the  "two-wheel  drive"  tasks  are  vigorously
                    implemented  to  strengthen  reform  and  innovation  and  stimulate  endogenous  motivation.  How  to  implement  the
                    requirements,  constantly  strengthen  process  control,  and  reduce  operating  costs  and  control  risks  is  an  urgent
                    issue  for  power  grid  enterprises.  Considering  the  actual  characteristics  of  current  power  transmission  and
                    transformation projects, cost risk identification and strategy research are helpful to explore into the risks existing
                    in  the  cost  control  process  of  power  transmission  and  transformation  projects.  It  is  important  to  scientifically
                    improve the risk management level of engineering cost, ensuring that power grid enterprises can accurately and
                    reasonably  predict,  prevent  and  control  the  cost  risks  of  power  transmission  and  transformation  projects  and
                    improve the efficiency and benefits of engineering construction.

                    Key  words:power  transmission  and  transformation  projects,the  whole  process  of  cost,risk  identification,


                    countermeasures
                    能源电力设施的投资与建设是社会经济发展                          行安全、优质、经济、绿色、高效的电网建设理念,
                的重要支撑与保障,“双碳”发展目标对构建现代                           加强输电工程造价管理,合理控制投资成本,提高
                能源体系提出了更高的要求对比,电网企业需要                            投资资金的精准度和利用效率,就显得尤为重要。
                强化电网平台贡献作用,肩负起服务新型电力系                                近年来,随着电网公司针对造价精准管控关
                统发展的重大责任。目前,输变电工程建设造价                            注程度的逐步提升,针对造价合理控制与管理的
                管理方面仍存在一些问题,例如:职责落实不到                            研究成果也越来越丰富。文献[1]构建了电网线
                位、流程走向不清晰;建设过程中费用控制、分包                           路工程造价影响因素分析模型,针对主要风险管
                管理、竣工结算等关键环节管理方面还存在一些                            控要点进行了筛选,为后续工程建设提供了借鉴
                薄弱环节等。因此,为了推进电网高质量发展,践                           与参考。文献[2]结合主客观赋权法和综合评价